Allied Lighting has recently completed an installation at the Home Office Dallas Court Manchester. The existing fluorescent lights have been replaced with 600mm x 600mm LED panels and 240mm x 11mm round LED downlights, in total 441 fittings have been installed.
The luminaires were supplied with DALI drivers. By utilising DALI control of the lighting the client is looking for further energy savings over and above the savings made in the change over to LED.
The fittings have been replaced throughout the offices, kitchen area, meeting rooms, corridors and stairways giving a lighter and airier working environment.
Keep updated, as a case study will follow, in the meantime sign up to our newsletter where you will receive regular updates about our services, products, projects and much more. http://allied.co.uk/newsletter-subscription/. Below are a few images taken after the installation was completed.
Trinity is a unique primary school which opened in 2010 to serve the needs of Buckshaw Village. As with everything on Buckshaw Village they have grown rapidly and from September 2017, are able to serve 540 children and their families and with growth to fully 3FE this number will rise to 630. From September 2017 […]
View ProjectAllied Lighting were recommended to complete an installation at Craven Swimming Pool and Fitness Centre Skipton. The existing 400w Metal Halide lighting has been replaced with 270w LED Projection Floods compact with a 1-10v dimmable controller, in total 23 fittings have been installed. The fittings have been replaced in the pool area across three walls […]
View Project