Trinity Primary School Project

BEFORE

The challenge was to provide the Lancashire County Council with a full LED lighting scheme compliant to CIBSE LG05: Lighting for education, a full emergency scheme with relevant design and documentation and a design for all exterior lighting. The Trinity foundation and key stage one site was a new build project carried out by John Turner Construction Group, who Allied worked closely with on the install of the lighting project.

AFTER

Upon being specified by LCC, Allied began work on procuring the most suitable fittings from trusted manufacturers in the UK and Europe. A full lighting design was carried out to comply to all regulations and an L2 compliance energy and control document was produced to ensure the selected luminaires produced optimum actual building power density (w/m2/100lux) for the client. A full emergency scheme was produced with again carefully selected luminaires and all relevant documentation. Finally all exterior lighting was specified and supplied by Allied including bollards, wall lights and street lighting with columns.

RESULT

A full emergency scheme was produced with again carefully selected luminaires and all relevant documentation. Finally all exterior lighting was specified and supplied by Allied including bollards, wall lights and street lighting with columns.

  • 75 % SAVINGS
  • 30.4 TONNES
  • Per Year

Services Used

    Sorry, no posts matched your criteria.

    Sorry, no posts matched your criteria.

    Sorry, no posts matched your criteria.

    Sorry, no posts matched your criteria.

    Sorry, no posts matched your criteria.

    Sorry, no posts matched your criteria.

Project Specification PDF

  • Enter your email address to receive the project PDF.