Trinity Primary School Buckshaw Village

Project PDF Click here to view

Trinity is a unique primary school which opened in 2010 to serve the needs of Buckshaw Village. As with everything on Buckshaw Village they have grown rapidly and from September 2017, are able to serve 540 children and their families and with growth to fully 3FE this number will rise to 630. From September 2017 we will be ONE school on TWO sites offering THREE forms of entry. Their Reception, Year One and Year Two children will be at our Brookwood Way site with Years 3,4,5 and 6 being accommodated in our original building on Unity Place.

The challenge was to provide the Lancashire County Council with a full LED lighting scheme compliant to CIBSE LG05: Lighting for education, a full emergency scheme with relevant design and documentation and a design for all exterior lighting. The Trinity foundation and key stage one site was a new build project carried out by John Turner Construction Group, who Allied worked closely with on the install of the lighting project.

Upon being specified by LCC, Allied began work on procuring the most suitable fittings from trusted manufacturers in the UK and Europe. A full lighting design was carried out to comply to all regulations and an L2 compliance energy and control document was produced to ensure the selected luminaires produced optimum actual building power density (w/m2/100lux) for the client. A full emergency scheme was produced with again carefully selected luminaires and all relevant documentation. Finally all exterior lighting was specified and supplied by Allied including bollards, wall lights and street lighting with columns.

Keep updated, as a case study will follow, in the meantime sign up to our newsletter where you will receive regular updates about our services, products, projects and much more. http://allied.co.uk/newsletter-subscription/.

 

 

 

 

 

 

 

 

 

Allied News

  • Trinity Primary School

    Click to read more

    Trinity Primary School

    Trinity is a unique primary school which opened in 2010 to serve the needs of Buckshaw Village. As with everything on Buckshaw Village they have grown rapidly and from September 2017, are able to serve 540 children and their families and with growth to fully 3FE this number will rise to 630. From September 2017 […]

    View Project
  • The Book People

    Click to read more

    The Book People

    View Project
  • Craven Swimming Pool and Fitness Centre

    Click to read more

    Craven Swimming Pool and Fitness Centre

    View Project
  • Craven Swimming Pool and Fitness Centre

    Click to read more

    Craven Swimming Pool and Fitness Centre

    Allied Lighting were recommended to complete an installation at Craven Swimming Pool and Fitness Centre Skipton. The existing 400w Metal Halide lighting has been replaced with 270w LED Projection Floods compact with a 1-10v dimmable controller, in total 23 fittings have been installed. The fittings have been replaced in the pool area across three walls […]

    View Project
  • Nuffield Health Printworks

    Click to read more

    Nuffield Health Printworks

    View Project
  • Home Office Dallas Court

    Click to read more

    Home Office Dallas Court

    View Project